top of page

Still using concrete bored piers?
Screw piling is a QUICK and more COST–EFFICIENT method of constructing a structural foundation than traditional concrete bored piers.
Twin-fin blade slices through underlying strata, like the ‘Katana’ samurai sword, leaving NO SPOIL to remove. Easy to attach extensions for depths > 4m.
Our range of screw types have been designed to suit a variety of applications

Bearer Plate &
Connector Plates
Standard bearer connections that easily fit our 20mm threaded top plate.

Maximum 80kN SWL
Safe working load for No More Digging raised floor system.

Hot Dipped Galvanised
Our standard screw pile coating for raised floors.

Applications
Frequently asked questions
Project Gallery

bottom of page